The Local Plans of Cambridge City Council and South Cambridgeshire
District Council have had a significant impact on Trumpington. This note
describes the 2006 and 2018 plans.
2006 Cambridge City Council Local Plan

The Cambridge Local Plan adopted in 2006 allowed the release of land around Trumpington for
house building, taking Clay Farm and Glebe Farm out of the Green Belt and including the
Monsanto 'brown field' site (Trumpington Meadows).

The development of the 2006 Local Plan began in 2001, following the publication of the
Cambridgeshire and Peterborough Structure Plan which specified that 12,500 homes should be
built in Cambridge between 1999 and 2016, of which 6500 were to be built within the built up
area of Cambridge and a further 6000 on the edge of Cambridge on land to be released from the
Green Belt (2006 Local Plan, p. 13-14).

By 2003, the land around Trumpington and Queen Edith's was being described as the Cambridge
Southern Fringe. The Council consulted on the scope of an Area Development Framework,
including at a workshop on 25 October 2003 attended by local groups, local residents,
councillors, officers and developers. This was followed by an exhibition and workshop on 10 and
19 March 2005. The areas being discussed included housing on the Clay Farm/Showground,
Glebe Farm, Monsanto/Trumpington Meadows and Bell School sites, the development of the
Addenbrooke's site and issues around green spaces, community integration, education and
community facilities, sustainable development and transport.
[Sources:
Nick Wates Associates for the Southern Fringe Member Reference Group (2003).
Event Record,
Cambridge Southern Fringe, Stakeholder Consultation Day
, Saturday 25 October 2003.
Cambridge City Council (2005).
Event Record, Cambridge Southern Fringe Community
Consultation
, April 2005.]
Front cover of the report on the workshop in October 2003. Front
cover o
f the report on the exhibition and workshop in April 2005.
Plan from the report on the exhibition and workshop
in April 2005.
One of the main inputs into the ADF was a report by the Trumpington Residents' Association in
September 2004, which stressed the need for a community centre, medical practice, schools and
the protection of the local environment.
[Source: Trumpington Residents' Association (2004).
Trumpington. Future development of an
historically important parish
. Cambridge: TRA.]

The Southern Fringe Area Development Framework (ADF) was approved on 10 January 2006.
It provided the basis for the subsequent developments. A summary of the ADF was incorporated
in the consultation on the 2018 Local Plan.
[Source:
Area Development Framework.]
Front cover of the Southern Fringe Area Development Framework, 2006.
The ADF fed into the 2006 Local Plan, approved in July 2006. This included the sites around
Trumpington as an Area of Major Change, with land to be removed from the Green Belt to
facilitate the development of Addenbrooke's Hospital and the new residential communities,
including a new Addenbrooke's Access Road and Guided Busway (p. 18, para. 2.6, map on p.
19, infrastructure details on p. 102). The housing developments totalled 3320 homes in the City
and another 629 homes in the District (p. 106-111).
[Source: Cambridge City Council (2006).
Cambridge Local Plan, July 2006. Cambridge: City
Council, see
background page and the 2006 Local Plan.]
Front cover from the 2006 Cambridge Local Plan.
The developments of housing, the Cambridge Biomedical Campus and transport links have
complied with this 2006 Local Plan.


2018 Cambridge City Council and South Cambridgeshire District Council Local Plans

The development of the current Cambridge Local Plan and South Cambridgeshire Local Plan
began in 2011 and after a protracted consultation and inspection process the documents were
finally approved in September and October 2018. The plans are designed to cover the period to
2031. There are two separate plans, although they are closely linked. Throughout the process,
the
Trumpington Residents' Association (TRA) gave detailed responses to the proposals.

In June 2012, the City Council carried out an Issues & Options consultation, when the TRAs
main concern was whether the plans would allow further development around the edges of the
city or maintain the separation between the city and the villages and concentrate development
further afield, in Northstowe, etc. The options for additional housing on the edges of the city
included land to the west of Trumpington Road (River Farm), land west of Hauxton Road
(Trumpington Meadows), land south of Addenbrooke's Road (south of Glebe Farm) and land
between Shelford Road and Babraham Road. The TRA was also concerned about proposals for
a sports stadium, with Grosvenor promoting the move of Cambridge United from its current
stadium to a new complex on Trumpington Meadows. In the TRA response in July 2012, there
was a strong argument against any major changes to the Green Belt, any further large-scale
housing developments around Trumpington and against the Trumpington Meadows site as the
location for the sports stadium.

In January 2013, there was another round of consultation on the sites that might be developed on
the edge of Cambridge and within the City. This was particularly significant to Trumpington, as
the Councils maintained the position that the majority of the remaining Green Belt close to
Cambridge was fundamentally important and should not be developed and that proposals for
further growth south of Trumpington Meadows and Glebe Farm should be rejected.

[Sources:
Cambridge City Council (2012).
Cambridge Local Plan - Towards 2031. Issues & Options
report
, June 2012.
Cambridge City Council (2013).
Cambridge Local Plan - Towards 2031. South Cambridgeshire
Local Plan. Issues & Options 2. Part 1 - Joint Consultation on Development Strategy and Site
Options on the Edge of Cambridge; Part 2 - Site Options Within Cambridge
, January 2013.]

The Councils developed the Local Plans in the next two years and issued a Proposed Submission
in July 2013. the TRA was very relieved that the Councils adopted a development strategy
(spatial strategy) that was firmly against further major housing developments close to the city and
the Councils did not support development on the local areas listed above. During the long
process when the Government Inspectors have been interrogating all the details in the plans, the
Councils have maintained their position, against ongoing criticism by developers who argued
against the overall spatial strategy and in favour of their specific projects. In May 2015, the
Inspectors asked the Councils to carry out further work and this resulted in a Modifications
Report in December 2015. The TRA made further responses to this report and was very relieved
to see that the additional work strengthened the Councils position that the Green Belt around
Trumpington was crucial to the setting of the city and there should be no further development.
However, there was concern at a proposal in the District Council plan to remove an area from
the Green Belt to the south of the Cambridge Biomedical Campus and designate this for the
further expansion of the Campus. The TRA argued hard against this modification but it became
part of the final plans.

[Sources:
Cambridge City Council (2013).
Cambridge Local Plan 2014: Proposed Submission, July 2013.
Cambridge City Council and South Cambridgeshire District Council (2015).
Cambridge Local
Plan. South Cambridgeshire Local Plan. Proposed Modifications. Joint Consultation Report
,
December 2015.]

After 4 years of assessment, the Inspectors who analysed the City and District Local Plans at last
found them 'sound' in September 2018. The plans went through a final approval process within
the Councils and were adopted in September and October 2018. In the City Local Plan, Policies
17 and 18 refer to the development of the Cambridge Biomedical Campus and the Southern
Fringe (p. 67-73). A summary of the ADF was incorporated in the Plan (Appendix D, p. 303). In
the District Local Plan, Policy E/2 refers to the further extension of the Cambridge Biomedical
Campus (p. 174-77).

[Source
s:
City Council: Cambridge City Council (2018).
Cambridge Local Plan, October 2018, see
background page and the 2018 Cambridge Local Plan.
District Council: South Cambridgeshire District Council (2018).
South Cambridgeshire Local
Plan
, September 2018, see background page and the 2018 South Cambridgeshire Local Plan.


After 2018: the next Local Plan

After this long process, the Councils are now committed to developing the next Local Plan,
which in this case will be a joint plan for the City and District. This review will start in 2019 and
should be completed by 2022. Hopefully, the forceful evidence about the importance of the local
Green Belt will be a crucial factor influencing the spatial plans in the next round.